China Taizhou Yaming Intelligent Equipment Co., Ltd. Email:[email protected]

We are a comprehensiveChina (Vehicle, Home Appliance, Electric) Integrated Assembly Line Manufacturing Factory
Telephone:+86 137-3657-7326
assembly line

Automated assembly line

Automated assembly lines make production more efficient and quality more stable.

  • vehicle production lines
  • HA production lines
  • motor production lines
  • Water pump assembly line
  • Refrigerator assembly line
  • Air conditioning assembly line
  • Washing machine assembly line
  • Two-wheeled vehicle assembly line
  • Motorcycle assembly line

vehicle production lines

Focused on vehicle production lines, we provide assembly lines for motorcycles, automobiles, and new energy vehicles. Tailored exclusive processes are designed for different vehicle models, covering component delivery, assembly, and testing. With high precision and optimal efficiency, we assist automotive manufacturers in enhancing production capacity and product quality.

Electric vehicle assembly line

About Us

Yaming is a Chinese manufacturer of integrated assembly line equipment for electric power, home appliances, vehicles and other fields.

China·Zhejiang Yaming Intelligent Equipment Co., Ltd

We focus on ​assembly line R&D and manufacturing, providing customers worldwide with efficient and reliable automated production solutions. Our products cover ​HA Assembly Lines, Motor Assembly Lines, E-bike Assembly Lines, Moto Assembly Lines, HEV Assembly Lines, E-trike Assembly Lines, and WP Assembly Lines, always responding to diverse industry production needs through customized services.
We specialize in delivering high-quality end-to-end assembly line solutions for manufacturing enterprises. From precise component assembly to comprehensive finished product inspection, our production lines span the entire product manufacturing chain, providing a solid and reliable foundation for large-scale production.
The company boasts an R&D team composed of experts in mechanical design, automation control, industrial engineering, and other fields. We offer one-stop services from scheme design and equipment manufacturing to installation and debugging, ensuring efficient end-to-end project implementation.

News

Industry insights and Yaming updates. Exploring the latest trends in smart manufacturing and intelligent automation solutions.

Do you know how long it takes to build a switchgear assembly line?

Do you know how long it takes to build a switchgear assembly line?

Switchgear Cabinet Assembly Line: From Discrete Operations to Flow Production 1. Line Overview The image shows a heavy-duty powered roller conveyor-based switchgear assembly line deployed in a spacious steel-frame workshop. The line consists of multiple segments of yellow-framed roller conveyors connected end-to-end, with galvanized steel rollers forming the carrying surface. The working height is ergonomically optimized for standing operators. A gray switchgear cabinet—with its main frame already installed—rests steadily on the conveyor. The cabinet surface shows pre-cut openings for instrument windows, ventilation grilles, and door lock mounting positions. Side busbar interfaces are visible, conveying the robust industrial character typical of electrical power equipment. The workshop ceiling is equipped with long-array LED lighting and red overhead crane rails, which support the hoisting and transfer of heavy cabinets. Ample logistics corridors flank both sides of the line. In the distance, packaged finished cabinets are stacked in the dispatch area, forming a complete production flow: "assembly → testing → offline → shipping." 2. Process Flow: Six Core Stages ┌──────────────────┐   ┌──────────────────┐    ┌──────────────────┐ │ Frame Loading │ │ Component Assembly │ │ Secondary Wiring...

05-12 2026

How does the agricultural machinery assembly line work?

What does the production line look like? This picture shows a typical tractor or harvester assembly line. The factory building is very high, with a ground conveyor line in the middle, working stations on both sides, and a platform above it. This design is very practical-the upper layer is used for parts and pre-assembly, and the lower layer is concentrated on assembling the whole machine without interfering with each other. The red track above the head is a crane, specially used for lifting heavy objects. The engine and gearbox on the agricultural machinery weigh hundreds of kilograms each and cannot be moved without a crane. Workers wear yellow helmets, use remote control to control the hook, accurately place large parts on the frame, and then tighten them with hand tools. The ground is conveyed by wide plate chains or roller beds, not by thin conveyor belts. Because the agricultural machinery chassis is large and the wheel spacing is different, ordinary conveyor belts cannot be used. This kind of ground line can be stopped, speed can be adjusted, and different models...

04-25 2026

How convenient is a mature air fryer assembly line?

1. Overall structure of the assembly line The assembly line uses a belt conveyor system as the core transmission carrier, and the black conveyor belt runs through the entire workshop to form a continuous production rhythm. There are multiple standardized workstations on both sides of the assembly line, and each workstation is equipped with professional assembly fixtures and testing devices. The picture clearly shows that the workers are wearing uniform orange overalls and blue dust caps, focusing on their work in their respective positions, embodying the core concept of "human-machine collaboration" in modern assembly lines. A process guidance board hangs on the top of the assembly line, detailing the operating specifications and quality standards of each workstation to ensure standardized execution of the assembly process. This visual management method is an important part of the lean production system. 2. Core assembly process The assembly process of air fryer can be divided into the following key links: 1. Workers at the shell pre-assembly station fix the host shell on a special fixture to perform preliminary assembly of structural parts. In the...

04-10 2026

Have you ever seen a real truck assembly line?

1. Transportation system: collaborative structure between skateboard line and suspension line The assembly line uses the Skid Conveyor as the main line, which is a standard configuration for the assembly of heavy vehicles. Skateboard body: A large steel flat plate carries the truck chassis, the size matches the vehicle wheelbase and wheel track, and the surface is covered with anti-slip pattern steel plates. The bottom of the skateboard is equipped with a guide wheel set and drive chain engagement mechanism. The carrying capacity is usually designed to be 15-25 tons, which meets the full-load assembly requirements of heavy trucks. Driving and positioning: A chain drive system is set on both sides of the line body, and the line speed is controlled by a frequency conversion motor. The normal operation is in the range of 0.5-2 meters/minute, corresponding to a single station operation time of 4-8 minutes. A pneumatic clamping mechanism is equipped at the stop of the station to accurately lock the skateboard with a positioning accuracy of ±2mm to ensure the stability of key processes such as tire tightening....

03-25 2026

How is the water dispenser assembly line composed?

Strategies for Improving Equipment Utilization in Water Dispenser Automated Assembly Lines As demands for production efficiency and quality continue to rise, automated assembly lines are becoming increasingly prevalent. Automated assembly lines for water dispensers are no exception. In the beverage market, drinking water occupies a significant market share, making the efficiency and reliability of water dispenser automated assembly lines critically important. This article outlines how to improve the equipment utilization rate of water dispenser automated assembly lines, thereby enhancing production efficiency and profitability. 1. Optimize Production Planning Reasonable production planning and scheduling for the water dispenser assembly line can ensure that equipment is fully utilized. By aligning production plans with equipment availability, a well-structured production schedule can be developed to maximize equipment output. Key Actions: Implement dynamic production scheduling that integrates order requirements and equipment status Establish a real-time monitoring mechanism for equipment utilization rates Deploy an Advanced Planning and Scheduling (APS) system to enhance scheduling accuracy 2. Predict Equipment Failures Predicting equipment failures is essential to address issues before they lead to downtime. This can be achieved by using...

View More